Headquarters

 

3802 MLK Jr. Blvd. (79404)

PO Box 3860

Lubbock, TX 79452

Get In Touch

 

Telephone: 806-993-0554

Fax: 806-993-0558

 

Transload and General Inquiry: 

info@titanlansing.com

Frac Sand Sales Inquiry:

TLFracSand@titanlansing.com

Ⓒ 2019 Titan Lansing Transloading, LLC

TLT announces acquisition of frac sand processing facility

November 21, 2014

NORTH BRANCH, Minnesota - Titan Lansing Transloading (TLT) has announced the purchase of a frac sand processing facility in North Branch, MN.  The plant, purchased from the Tiller Corporation, sizes and dries raw sand from area mines into a finished product suitable for well fracing operations.  The sand is then loaded into rail cars and shipped to energy production destinations around the country -- including TLT's four destination transloads in Texas and Eastern New Mexico.

 

"We are proud to add this processing asset to TLT's existing network of transloading locations," Shannon Himango, Titan Lansing Transloading president, said. "This purchase allows us to vertically-integrate our supply chain, resulting in greater efficiencies throughout our operation."

 

The facility is on the St. Croix Railroad (SCXY) and is served by the BNSF Railway.  It has 700,000 tons of annual processing capacity.

 

Please reload

Featured Posts

TLT announces acquisition of frac sand processing facility

November 21, 2014

1/1
Please reload

Recent Posts
Please reload

Archive
Please reload

Search By Tags
Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square